Inwave, unlike the majority of companies that only provide consulting services in this area, offers a “turnkey” solution including feasibility study and inclusion in PPB, providing the nationalized product in Brazil and monitoring the obligations.
6 Months | Flexibility study | |
---|---|---|
PPB Inclusion | PPB Inclusion | |
Product available to sales | ||
PPB warranty and obligations |
Feasibility study
The stages of the process, both technical and administrative parts, are realized in a minimum period of time thanks to conduction in parallel of the engineering tasks and legal procedures.
QUANTITY | $ 1.000 | ||
PRICE COST-EXW | $ 40,00 | ||
TOTAL GROSS WEIGHT | 5 Kg | ||
DIMENSIONS OF VOLUME | 20mmx500mmx500mm | ||
EX-WORKS COST | $ 40.000,00 | ||
INTERNATIONAL SHIPPING | $ 2.333,33 | ||
INSURANCE | 3,00% | $ 3.000,00 | |
CIF COST | $ 43.533,33 | ||
IMPORT TAX (II) | 3,00% | $ 1.306,00 | |
INDUSTRIAL TAX (II) | 4,00% | $ 1.793,57 | |
REGISTRATION FEE DI | $ 35,00 | ||
PIS TAX | 1,65% | $ 1.014,81 | |
COFINS TAX | 7,60% | $ 4.674,28 | |
ICMS TAX | $ 11.985,34 | ||
CONTRACT CHANGE / BANK EXP | $ 75,00 | ||
CONTRACT CHANGE / INSURANCE | $ 75,00 | ||
CUSTOMS CLEARANCE | $ 250,00 | ||
AGENT | $ 100,00 | ||
AWB RELEASE | $ 40,00 | ||
STORAGE | $ 435,33 | ||
WHARFAGE | $ 75,00 | ||
PROTOCOL | $ 255,17 | ||
COST LANDED US$ | $ 65.647,84 | ||
INTEREST | $ 1.641,20 | ||
REAL COST | $ 67.289,03 | ||
MAX LOCAL SMT MOUNT SERVICE | $ 40.000,00 | ||
COST LOCAL SUPLIER | $ 14.000,000 | ||
UNIT REAL COST | $ 121.289,03 | ||
VALUE SALES OF PRODUCTS W/O IPI FOR SAME | |||
INCOME | $ 331,56 | ||
ADDITIONAL IPI | 3,00 % | $ 8,15 | |
VALUE SALES | $ 341,51 |
In this example the nationalized product cost, will be US$ 121.29 against US$ 220.00 for same imported product. Adding the economy from the IPI in the sale, the final sales price of US$ 341.51 returns the same profit than a final selling price of US$ 580.85 in the case of the imported product.
The feasibility study according to the NCM classification of the product, market price, the complexity of nationalization, allows to validate or not the local industrialization project and the inclusion in the PPB.
Inclusion in the PPB
The process monitoring until the establishment of the Interministerial Ordinance, signed by the Ministers of Development, Industry and Foreign Trade (MDIC) and of Science, Technology and Innovation (MCTI) and Ministry of Finance consists of the following tasks:
✓ Preparation of the R & D plan;
✓ Preparation of PPB’s plea;
✓ Temporary tax benefit approval (for one month);
✓ Adoption of the final tax benefit;
✓ Products inclusion;
✓ Control of the minimum R & D obligation;
✓ Monitoring and the R & D reports filling;
✓ Registration of the products in the BNDES;
Nationalization
In parallel with the inclusion in the PPB Inwave provides the engineering work to include the products in our assembly line, guaranteeing shorter deadline to complete the process.
✓ Creation of imported components kit;
✓ Local manufacture of printed circuit boards;
✓ Adequacy of pick and place / printer for boards assembly;
✓ Components importation;
✓ Assembly and testing of mounted electronic boards;
✓ Mechanical assembly;
✓ Burn in;
✓ packaging;
✓ Inventory and components and finished products management;
Inwave offers the product for sale to local distributor or direct billing to final customer with BNDES financing.
After Sales
Maintaining the PPB and the factory warranty of manufactured products require a steady job that Inwave offers without concern for the distributor who can stay focused on his own commercial work and developing markets.
✓ Factory return, defects analysis, reports;
✓ Products repairs;
✓ Shipping to the client;
✓ Components for maintenance, inventory management;
✓ Annual reports R & D obligation;
✓ Calculation of requirements depending on the issued NF;
✓ Guidance for R & D required investments;
✓ Direct investment, outsourced or institutional;